David Y. Ige | DOT NEWS RELEASE: MAUI LANE CLOSURES FOR THE WEEK OF MAY 15 – MAY 21
DOT NEWS RELEASE: MAUI LANE CLOSURES FOR THE WEEK OF MAY 15 – MAY 21
Posted on May 14, 2021 in Latest News, Newsroom
PLEASE NOTE:
Lane closure plans can be changed at any time without further notice. All projects are weather dependent.
– – HONOAPIILANI HIGHWAY (ROUTE 30) – –
1) LAHAINA
Closure of the left lane on Honoapiilani Highway (Route 30) south between mile markers 19.8 and 21, Aholo Road and Lahainaluna Road, on Tuesday, May 18, from 8:30 a.m. to 2:30 p.m. for landscaping.
2) KAPALUA TO KAHAKULOA
One-lane closure of Honoapiilani Highway (Route 30) in both directions between mile markers 31 and 41.6, Lower Honoapiilani Road, Kahekili Highway, Monday, May 17 through Friday, May 21, from 8:00 a.m. to 2:30 p.m. for guard rail maintenance .
– – PIILANI HIGHWAY (ROUTE 31) – –
1) KIHEI
Single lane closure on Piilani Highway (Route 31) in both directions between mile markers 0.0 and 7.2, N Kihei Road and Wailea Ike Drive on Monday, May 17 through Friday, May 21, from 8 a.m. to 5 p.m. at Remove strips on the sidewalk and debris strip work.
– – KAAHUMANU AVENUE (ROUTE 32) – –
1) WAILUKU (WEEKEND WORK)
Closing the left lane on Kaahumanu Avenue (Route 32) west between mile markers 1.4 and 1.8, S Papa Avenue and S Wakea Avenue, on Saturday, May 15, from 8:00 a.m. to 3:30 p.m. to replace the utility pole.
– – HANA HIGHWAY (ROUTES 36/360) – –
1) KAHULUI
Closing the right lane on Hana Highway (Route 36) east between mile markers 0.0 and 9, Kaahumanu Avenue and Hookipa Park on Wednesday, May 19 through Friday, May 21, 7:00 a.m. to 4:00 p.m. Cleaning the storm drain.
2) KAHULUI
Closing the right lane on Hana Highway (Route 36) east between mile markers 1.4 and 1.5, Hookele Street and Hana Highway, Monday, May 17 through Tuesday, May 18, from 8 a.m. to 4 p.m. at Replace the power pole.
3) KAHULUI
Right shoulder closure on Hana Highway (Route 36) east between mile markers 1.5 and 2.4, Hookele Street and Hansen Road, Wednesday May 19 through Friday May 21, 8-16 Clock to replace the power pole.
4) HAIKU
Single-lane closure on the Hana Highway (Route 36) in both directions at a time between mile markers Feb 13 and Feb 16, Kuiaha Road and Kaupakalua Road, on Monday, May 17 through Friday, May 21, from 6 a.m. to 3 p.m. for guard rail maintenance.
5) HAIKU
Lane change and shoulder closure on Hana Highway (Route 36) in both directions near the mile marker 6/13, Peahi Road, on Tuesday, May 18, from 8:30 a.m. to 3:00 p.m., to inspect the bridge.
4) HAIKU TO HANA
Single-lane closure on Hana Highway (Route 360) in both directions between mile markers 0.0 and 34.8, Kaupakalua Road and Uakea Road, Monday, May 17 through Friday, May 21, from 6 a.m. to 3 p.m. for guardrail maintenance .
5) HAIKU
Closing the right lane on the Hana Highway (Route 360) in an easterly direction between mile markers 1.9 and 4.5, Ulalena Loop and Door of Faith Road, Monday, May 17 through Friday, May 21, from 8:30 a.m. to 2 p.m. : 30 o’clock, for tree cutting work.
7) HAIKU (24 HOUR / WEEKEND WORK)
Single-lane closure of the Hana Highway (Route 360) in a westerly direction between mile markers 2.8 and 3.2, Ulalena Loop and Waipio Road, on Saturday, May 15 through Friday, May 21, 24 hours a day, for passage work.
6) HAIKU (24/7, WEEKEND WORK)
Single-lane closure on Hana Highway (Route 360) in an easterly direction between mile markers 8/12 and 8/12, Kaumahina State Wayside Park and Hana Highway on Saturday, May 15 through Friday, May 21, 24 hours a day for Rock fall mitigation work. One lane is closed around the clock. Temporary traffic signals will be in place to control traffic.
9) HAIKU
Single lane closure on Hana Highway (Route 360) in both directions near mile marker 19.3, Wailua Nui Stream, Monday, May 17 through Friday, May 21, from 8:30 a.m. to 3:00 p.m. for repairs at rockfall barriers.
– – HALEAKALA HIGHWAY (ROUTES 37/377) – –
1) KAHULUI (WEEKEND WORK)
One-lane closure of the Haleakala Highway (Route 37) south near the mile marker 0.0, the Hana Highway, and the Haleakala Highway on Saturday, May 15, from 8:30 am to 3:30 pm to replace the power pole.
2) PUUNENE (NIGHT WORK)
Single-lane closure of Haleakala Highway (Route 37) south between mile markers 0.9 and 4.8, Haliimaile Road and Haleakala Highway on Monday evening, May 17 through Friday morning, May 21, from 8 p.m. to 6 a.m. for installation work.
3) KULA
Closure of the right lane on Haleakala Highway (Route 377) south between mile markers 5.5 and 6, Kulalani Drive and Haleakala Highway (Route 378) on Friday, May 21, from 8 a.m. to 4 p.m. to replace the utility pole.
– – KULA HIGHWAY (ROUTE 37) – –
1) KULA
Alternate single-lane blockage on the Kula Highway (Route 37) heading north between mile markers 8.1 and 10, Aapueo Parkway and Omaopio Road, Monday, May 17 through Friday, May 21, from 8 a.m. to 5 p.m. for installation of the Guard rail and shoulder plaster.
– – WAIEHU BEACH ROAD (ROUTE 3400) – –
1) KAHULUI
Closure of the right lane on Waiehu Beach Road (Route 3400) going north between mile markers 0.0 and 2.6, W Kaahumanu Avenue and Waiehu Beach Road on Wednesday May 19 through Friday May 21 from 7:00 a.m. to 4:00 p.m. Clock cleaning the rainwater.
###
Comments are closed.